Home > Miner Store > Immersion Cooling > Container Mining
Click To Enlarge
Immersion Cooling Container BC20 MEGA Support Up to 192 AntMiner S19/XP or 240 WhatsMiner M50/M30 Support customization
SKU: Fog Hashing BC20

The BC20 MEGA is a high-density immersion cooling design with the goal of providing a full-stack solution for large-scale mining customers. Support up to 192 miners (AntMiner S19/XP) or 240 miners (WhatsMiner M50/M30) inside.

Apexto Immersion Cooling for Crypto Mining

——Provide from Home Mining to Large-scale Mining Solutions

 

BC Series – Ultra-High-Density Immersion Cooling System

The BC/MC Series is an ultra-high-density immersion cooling product line with the goal of providing a highly integrated turn-key solution for large-scale miners. As an all-in-one product, it integrates all required devices as a whole, including immersion tanks, power distribution cabinets, smart PDUs, network interfaces, circulation pipes, external coolers, controllers, monitoring devices, etc., for mining farms to deploy simply and fast.

Design Advantages

Flexible options for different scales

From 168kW to 2.02MW cooling capacity.

Customization support for clients to choose configurations according to requirement.

Mobile, integrated and expandable

 

Warning: Trying to access array offset on value of type bool in 

/www/wwwroot/apextomining/apexto/themes/ Woodmart/inc/modules/lazy-loading.php on line 271
           

Warning: Trying to access array offset on value of type bool in 

/www/wwwroot/apextomining/apexto/themes/ Woodmart/inc/modules/lazy-loading.php on line 272

Warning: Trying to access array offset on value of type bool in

/www/wwwroot/apextomining/apexto/themes/ Woodmart/inc/modules/lazy-loading.php on line 271

Warning: Trying to access array offset on value of type bool in

/www/wwwroot/apextomining/apexto/themes/ Woodmart/inc/modules/lazy-loading.php on line 272

 
Extremely low O&M costs
The Single-loop design allows to shut down each immersion tank separately, to realize minimal downtime.

Reliable and easy-to-maintain piping design.

All-round intelligent management system

Integrates 3 management systems: cooling control, power monitoring and security monitoring systems.

 

Warning: Trying to access array offset on value of type bool in

/www/wwwroot/apextomining/apexto/themes/ Woodmart/inc/modules/lazy-loading.php on line 271

Warning: Trying to access array offset on value of type bool in

/www/wwwroot/apextomining/apexto/themes/ Woodmart/inc/modules/lazy-loading.php on line 272

Ultimate cooling capacity with redundancy design

Either close water towers or dry coolers is supported, with extra redundancy of cooling capacity to adapt to a variety of extreme climates.

 

Support customization

The BC20 MEGA supports customized external cooling options based on the deployment environment and requirements.

geographic location | Ambient temperature Humidity | source of water | overclocking range | Run the type of mining machine

Solution 1: BC20 MEGA+Closed Water Tower

Suitable for areas with abundant water resources.

Solution2:  BC20 MEGA+Dry Cooler

Suitable for dry and water shortage areas.

 

Product Specification

1. BC20 MEGA Container

BASIC

PRO

Dimensions(L*W*H)(mm)5820*2438*28965820*2438*2896
Shipping Weight(T)77
Operating Weight(T)1212
Coolant Capacity (L)70007000
Cycle ModeSingle loopSingle loop
Miner Capacity192 S19/M50

192 S19 / 240 M50

Tank QuantityB24 Tank*8B24 Tank*8
Operating Temperature(℃)-25°C ~55℃-25°C ~55℃

  
Electrical Performance (- /✓ optional/standard)

BASIC

PRO

Input Voltage and Frequency3-phase 350-480V 50/60Hz3-phase 350-480V 50/60Hz
Max Power Load (kW)8991411
Output Voltage and FrequencySingle-phase 200-277V 50/60HzSingle-phase 200-277V 50/60Hz
Safety CertificationCE/ULCE/UL
Operating Power(kW)5067
Power Distribution Cabinets(A)630Ax1 *21000Ax1 *2
PDU

Smart PDU * 8

Smart PDU * 16

Inlet CableThe inlet cables can withstand high-voltage of above 600V, with the following requirements per phase:L1 4-wires cable 1AWG(42.4mm x4) x1 *2L2 4-wires cable 1AWG(42.4mm x4) x1 *2L3 4-wires cable 1AWG(42.4mm x4) x1 *2N 4-wires cable 1AWG(42.4mm x4) x1 *2PE 1-wire cable 1AWG(42.4mm) x1 *2The inlet cables can withstand high-voltage of above 600V, with the following requirements per phase:L1 4-wires cable 3/0AWG(85mm x4) x1 *2L2 4-wires cable 3/0AWG(85mm x4) x1 *2L3 4-wires cable 3/0AWG(85mm x4) x1 *2N 4-wires cable 3/0AWG(85mm x4) x1 *2PE 1-wire cable 3/0AWG(85mm) x1 *2
Smart Meter
Integrated Wiring
Network
UPS
SPD
Cooling Capacity

BASIC

PRO

Cooling Capacity(kW)7200960
Cooling Type

Closed water cooling tower

or Dry cooler

Closed water cooling tower

or Dry cooler

Inlet Temperature(℃)4545
Outlet Temperature(℃)6060
Design Reference Temperature (℃)3535
Advisory Service
Please send us your RFQ to get your exclusive sales manager assistance.
Best-Selling
Subscribe to TG Channel

Get the latest crypto mining information

Subscribe to email

Request inventory & stock list
Get the weekly Goldtime miner price list and inventory availability.

Copyright © Goldtime Mining Co.,Ltd. All Rights Reserved.    Sitemap   XML