Home > Immersion Cooling > BC Series – Container Mining
Click To Enlarge
Immersion Cooling Container BC10 MEGA Support Up to 96 AntMiner S19/M50 Support Customization
SKU: Fog Hashing BC10

The BC10 MEGA is a high-density immersion cooling design with the goal of providing a full-stack solution for large-scale mining customers. Support up to 48 miners (AntMiner S19/WhatsMiner M50) inside.

Apexto Immersion Cooling for Crypto Mining

——Provide from Home Mining to Large-scale Mining Solutions

 

IMMERSION COOLING CONTAINER BC10——Designed for large-scale minin

 

Liquid Immersion Cooling: Technical Advantages

• Precise temperature control – Provides a controlled environment for chipsets and eliminates “electron migration phenomena” caused by high heat.

• Stable operation – Reduces failures, increases uptime-rate close to 100%.

• Longer lifecycle – The mining machines are isolated from the air and free from dust, static electricity, short circuit, oxidation, and fan vibration, extending the lifecycle of the mining machine to more than 5 years in average.

• Low noise – Eliminates the noise problem of air cooling and allows to deploy in residential and commercial areas.

• Overclocked hashrate – Up to 60% of hashrate overclocking will shorten the return cycle and boost the ROI.

• Reduced O&M cost – Stable operating capability combined with FH remote monitoring system can reduce maintenance costs by up to 90%.

• Lower cooling cost – FH intelligent power management system can reduce cooling energy consumption (PUE 1.02~1.05) and carbon emission more effectively.

 

 

Specification

BASICPRO
Dimensions(L*W*H)(mm)2991*2438*25912991*2438*2591
Shipping Weight(T)33
Operating Weight(T)66
Coolant Capacity (L)36003600
Cycle ModeSingle loopSingle loop
Miner Capacity96 S19/M5096 S19/M50
Tank QuantityB24 Tank*4B24 Tank*4
Operating Temperature(℃)-25°C ~55℃-25°C ~55℃

  
Electrical Performance (- /✓ optional/standard)
BASICPRO
Input Voltage and Frequency3-phase 350-480V 50/60Hz3-phase 350-480V 50/60Hz
Max Power Load (kW)444706
Output Voltage and FrequencySingle-phase 200-277V 50/60HzSingle-phase 200-277V 50/60Hz
Safety CertificationCE/ULCE/UL
Operating Power(kW)2533
Power Distribution Cabinets(A)630Ax1 *11000Ax1 *1
PDU

Smart PDU * 4

Smart PDU * 8

Inlet CableThe inlet cables can withstand high-voltage of above 600V, with the following requirements per phase:L1 4-wires cable 1AWG(42.4mm x4) x1 *1L2 4-wires cable 1AWG(42.4mm x4) x1 *1L3 4-wires cable 1AWG(42.4mm x4) x1 *1N 4-wires cable 1AWG(42.4mm x4) x1 *1PE 1-wire cable 1AWG(42.4mm) x1 *1The inlet cables can withstand high-voltage of above 600V, with the following requirements per phase:L1 4-wires cable 3/0AWG(85mm x4) x1 *1L2 4-wires cable 3/0AWG(85mm x4) x1 *1L3 4-wires cable 3/0AWG(85mm x4) x1 *1N 4-wires cable 3/0AWG(85mm x4) x1 *1PE 1-wire cable 3/0AWG(85mm) x1 *1
Smart Meter
Integrated Wiring
Network
UPS
SPD
Cooling Capacity
BASICPRO
Cooling Capacity(kW)360480
Cooling Type

Closed water cooling tower

or Dry cooler

Closed water cooling tower

or Dry cooler

Inlet Temperature(℃)4545
Outlet Temperature(℃)6060
Design Reference Temperature (℃)3535
Advisory Service
Please send us your RFQ to get your exclusive sales manager assistance.
Best-Selling
Subscribe to TG Channel

Get the latest crypto mining information

Subscribe to email

Request inventory & stock list
Get the weekly Goldtime miner price list and inventory availability.

Copyright © Goldtime Mining Co.,Ltd. All Rights Reserved.    Sitemap   XML